Transport for wind and offshore energy

Wind and offshore energy

For companies delivering wind and offshore projects who need a partner experienced in oversized cargo.

Cartrag organises transport of components - turbines, towers, transformers, generators and steel structural elements. Imports from Asia and Europe, exports from Poland, handling of Baltic projects. Every shipment is run by a dedicated contact with project cargo experience.

01.

Typical cargo in wind and offshore energy

Cargo typeCharacteristicsSensitivity
Wind turbine blades60-90 m length, specialist transportDimensions, surface damage
Towers and tower sectionsSteel elements, large diametersPoint loads, corrosion
Transformers and generatorsVery large weight, point loadsVibration, transport position
Turbine nacellesLarge dimensions, high valueDimensions, anti-corrosion protection
Offshore structural elementsSteel, irregular shapesCorrosion, loads
Cables and electrical equipmentLarge reels, significant weightDeformation, moisture
02.

Logistics challenges in wind and offshore energy

Wind and offshore projects set sea forwarding requirements beyond standard container transport:

  • Dimensions that exclude a standard container. Turbine blades, towers and nacelles require conventional vessels, heavy-lift or platforms and an individual transport design.
  • Schedule precision. A delivery delay shifts the entire farm assembly schedule. The forwarder coordinates transport with the contractor, terminal and installation crew.
  • Permits and road route. The road leg requires a route survey, GDDKiA permits and often pilot car escorts.
  • Anti-corrosion protection. Steel elements exposed to salt water for 30-50 days require professional protection before loading.
  • Coordination of multiple stages. OOG transport for the energy sector combines sea freight, the road leg and transhipments - all stages synchronised in one schedule.
03.

How Cartrag serves wind and offshore energy

Cartrag organises transport of wind and offshore components as a logistics project - from feasibility analysis to delivery at the installation site. Every shipment is run by a dedicated contact with project cargo experience.

  • For oversized cargo: selection of the method (flat rack, open top, heavy-lift, RO-RO), carrier booking, coordination with the port terminal.
  • For the road leg: route survey, GDDKiA permits, pilot car escort organisation.
  • For corrosion-prone steel elements: professional anti-corrosion protection as part of the Container Packing service.
  • For multi-stage projects: one point of contact coordinating sea freight, transhipments and road transport in a single schedule.
04.

Transport services for wind and offshore energy

ServiceWhen in wind energy
OOG / Project CargoTurbines, towers, nacelles, transformers, offshore structural elements
FCLElectrical equipment, cables, components that fit in a container
Container PackingAnti-corrosion protection of steel elements, securing of high-value components
05.

Certificates and requirements in wind and offshore transport

RequirementScope of Cartrag's handling
Carrier acceptance for OOG cargoBooking with confirmation of special cargo acceptance
GDDKiA road permitsOrganisation of abnormal transport permits
Route surveyVerification of the route for viaducts, bridges and road bearing capacity
OOG customs documentationBill of lading with OOG annotations, import and export clearance
OOG cargo insurancePolicy matched to oversized cargo risks
06.

Wind and offshore transport - frequently asked questions

Blades (60-90 m) require a conventional vessel or heavy-lift ship. Cartrag runs the whole process - dimensional analysis, carrier selection, terminal coordination, delivery to the installation site.

Preparation - analysis, permits, booking - from a few days to a few weeks. Sea transit on Asian routes is approximately 30-50 days.

Yes - coordination with terminals in Gdańsk and Gdynia, customs handling and road transport to the installation site.

GDDKiA permits, a route survey and pilot car escorts. Cartrag organises all road formalities.

Yes, with no minimum volume and no long-term contract required to start.

Borys

YOUR CONTACT

Borys | forwarding at Cartrag

"Not everything in forwarding is up to us. But there is always something we can do."